ET₀ Irrigation Scheduler
FAO-56 reference ET₀, crop water use, daily soil-water balance with stress, irrigation schedule, yield response and water economics.
Excel decision tool · Irrigation & water
Centre-pivot flow, span hydraulics, pump duty, capital cost and economic mainline sizing.

Sizes a centre pivot from peak crop water demand and span layout, checks pressure along the machine, derives pump duty and power, and adds the investment layer: installed capital cost, cost per irrigated hectare, life-cycle energy cost and the economically optimal mainline diameter (capital vs pumping energy). Outputs feed the Pump Energy Comparator and the Greenfield Farm Investment Model.
A centre pivot (center pivot) design calculator in Excel: flow, span hydraulics using Hazen-Williams, pump duty and capital cost.
| Sheet | Type | What it contains |
|---|---|---|
| Cover | Cover | Title page, purpose, status and conventions. |
| Contents | Navigation | Model map with links to every sheet. |
| Dashboard | Output | Design and investment summary for the pivot on the active scenario. |
| Inputs | Input | Scenario-driven assumptions register. Edit yellow cells only. |
| Span Layout | Input | Span lengths and internal diameters from the dealer specification (outer overhang as the last used row). |
| Quick Size | Calculation | Area, flow and system capacity from span layout and peak demand. |
| Span Hydraulics | Calculation | Flow at each span mid-radius, velocity, Hazen-Williams friction and pressure profile along the machine. |
| Pump Duty | Calculation | Mainline losses, total dynamic head, power and seasonal energy at the design flow. |
| Mainline Economics | Calculation | Life-cycle cost of each standard mainline diameter: pipe capital + pump capital + discounted pumping energy. The minimum is the economic diameter. |
| Capital Cost | Calculation | Installed capital cost of the pivot system and unit economics per irrigated hectare. |
| Sensitivity | Output | Required flow and system capacity for peak ETc (down) and operating hours (across), plus TDH and power vs mainline diameter. |
| Risk Register | Control | Key investment and operating risks, scored Likelihood × Impact (1–5). Edit the scores and mitigations for your project. |
| Checks | Control | Integrity, reasonableness and data-quality tests. A failed Error must be fixed before results are relied on. |
| Methodology | Reference | Calculation methods, formulae, sources and limitations. |
| Version Log | Reference | Change control. Record every material change to logic or assumptions. |
Metric units throughout (hectares, m³, mm). Replace the illustrative figures with your own verified data before relying on any result.
FAO-56 reference ET₀, crop water use, daily soil-water balance with stress, irrigation schedule, yield response and water economics.
Life-cycle cost, levelised cost of water, carbon and payback for diesel, grid and solar-hybrid pumping.
20-year development appraisal for an irrigated greenfield farm: CAPEX, operations, debt, tax, three-statement financials and returns.