Farmland due diligence checklist: 13 criteria that decide an irrigated site

Soils, water, climate, logistics and tenure — the thirteen criteria we use to screen irrigated farmland, with deal-breakers and weighting.

AgriVenture Advisory · 23/11/2026

Most farmland that disappoints investors does so for reasons that were visible before purchase: water that was never really available, soils too saline to hold yields, or a site so far from power and market that every tonne costs too much to move. A structured checklist turns a site visit into a comparison you can defend to an investment committee. These are the thirteen criteria we use to screen land for irrigated field crops, grouped by what they tell you.

Soil and land

  1. Effective soil depth. Rooting depth sets how much water the soil can store between irrigations. Below about 50 cm (20 in), irrigated field crops struggle; 100–150 cm (40–60 in) or more is strong.
  2. Soil salinity (ECe). Saturated-paste electrical conductivity above about 4 dS/m starts to cut yields of sensitive crops; above 8 dS/m most field crops suffer. Salinity is expensive and slow to fix.
  3. Slope. Centre pivots (center pivots) handle gentle slopes well, but above roughly 6% runoff, erosion and wheel-track problems increase. Below 1.5% is ideal.

Water

  1. Water available per hectare. Not the volume in a well test — the volume you are legally entitled to and that the resource can sustain, every year, in m³/ha (or acre-feet per acre). Compare it with the crop's annual net irrigation requirement.
  2. Irrigation water salinity (ECw). Water above about 2–3 dS/m brings salts into the soil with every irrigation and needs leaching water on top of crop demand.

Climate

  1. Annual rainfall. Useful rainfall reduces pumping and the size of system needed.
  2. Reference evapotranspiration (ET₀). Higher annual ET₀ means more water per tonne of crop. See our ET₀ guide.
  3. Frost-free days. The length of the growing window decides whether double-cropping is realistic.

Scale and logistics

  1. Contiguous block size. Large, unbroken blocks lower development and operating cost per hectare; fragmented parcels add roads, mainline and travel time.
  2. Distance to a paved road.
  3. Distance to a power line. Grid connection cost can make or break electric pumping.
  4. Distance to port or main market. Freight is paid on every tonne, every year.

Tenure

  1. Land tenure. Freehold scores highest, then long leases (49 years or more). Customary or unclear tenure needs a legal opinion on title, community consent and lease registration before anything else.

Deal-breakers come before scores

A weighted score can hide a fatal flaw: a site can score well on average and still have no secure water. Set deal-breakers first — for example insufficient water entitlement, soil salinity beyond economic reclamation, or tenure that cannot be secured — and reject any site that fails one, whatever its total.

Weight for your strategy, then test the weights

A water-and-soil investor and a logistics-and-market investor will weight these criteria differently. Score each site 1–5 against clear thresholds, apply your weights, and then check whether the ranking changes under a different weight set. If it does, the decision is closer than it looks.

Penalise what you haven't verified

Desk estimates and vendor figures are not the same as field data. Deduct points from any criterion that is estimated or unknown, so that a site with a full, verified data set is not ranked below one that simply looks good on paper. The data gaps on the preferred site become your due diligence request list.

These thresholds are a starting point for irrigated field crops in semi-arid conditions. Adjust them for your crops, region and investment policy.

Want an independent review of your project?

We advise investors, lenders and developers on irrigation, investment cases and due diligence.

Talk to us

Tools for this

Land Due Diligence Scorecard

Weighted multi-criteria site screening with deal-breakers, data-confidence haircut, weight robustness, value-for-money and DD tracker.

17 sheets · Excel 2016+ · no macros

US$99Launching soonView tool

Greenfield Farm Investment Model

20-year development appraisal for an irrigated greenfield farm: CAPEX, operations, debt, tax, three-statement financials and returns.

17 sheets · Excel 2016+ · no macros

US$179Launching soonView tool

More guides

Field Notes newsletter

Practical notes on farmland, irrigation and farm economics

A short monthly email with our newest guides, tool updates and what we're seeing in farmland investment. No spam; unsubscribe any time.

Subscribe by email