Land Due Diligence Scorecard
Weighted multi-criteria site screening with deal-breakers, data-confidence haircut, weight robustness, value-for-money and DD tracker.
Excel decision tool · Investment & land
20-year development appraisal for an irrigated greenfield farm: CAPEX, operations, debt, tax, three-statement financials and returns.

Appraises a phased greenfield irrigated farm development from land and water through CAPEX, crop revenue, operating costs, senior debt and tax to integrated financial statements, project and equity returns, debt cover and sensitivity. Built for investment committees, lenders and development partners who need an auditable, scenario-driven view of value and risk.
A 20-year farm investment and development model in Excel with debt, tax and three-statement financials.
| Sheet | Type | What it contains |
|---|---|---|
| Cover | Cover | Title page, purpose, status and conventions. |
| Contents | Navigation | Model map with links to every sheet. |
| Dashboard | Output | Investment committee summary: returns, funding, debt cover, value drivers and charts for the active scenario. |
| Inputs | Input | Scenario-driven assumptions register. Edit yellow cells only. |
| Crop Plan | Input | Rotation, mature yields, year-1 prices, variable costs and irrigation need. Scenario factors on Inputs are applied on top. |
| Land & Water | Calculation | Development programme, cropped area, wells and water demand, with yield ramp-up by development block. |
| Revenue | Calculation | Production and revenue by crop: yield-weighted area × share × yield × price, with escalation and scenario factors. |
| OPEX | Calculation | Operating costs escalated by cost inflation and the OPEX scenario factor. Machinery running costs sit in crop variable costs. |
| CAPEX | Calculation | Development, replacement and sustaining capital expenditure, escalated; straight-line depreciation by asset class; net book value. |
| Financing | Calculation | Senior debt: drawdown against development CAPEX during the grace period, interest, equal principal repayment, fees and cover ratios. |
| Financials | Calculation | Integrated income statement, cash flow (with equity funding and distributions) and balance sheet. The balance check must be zero every year. |
| Returns | Calculation | Project (unlevered) and equity cash flows, terminal value, discounting, debt-cover ratios and headline returns. |
| Sensitivity | Output | Pre-tax project NPV: one-at-a-time tornado, break-even headroom and two-way grids. Linear decomposition of discounted revenue, OPEX and CAPEX. |
| Risk Register | Control | Key investment and operating risks, scored Likelihood × Impact (1–5). Edit the scores and mitigations for your project. |
| Checks | Control | Integrity, reasonableness and data-quality tests. A failed Error must be fixed before results are relied on. |
| Methodology | Reference | Calculation methods, formulae, sources and limitations. |
| Version Log | Reference | Change control. Record every material change to logic or assumptions. |
Metric units throughout (hectares, m³, mm). Replace the illustrative figures with your own verified data before relying on any result.
Weighted multi-criteria site screening with deal-breakers, data-confidence haircut, weight robustness, value-for-money and DD tracker.
Centre-pivot flow, span hydraulics, pump duty, capital cost and economic mainline sizing.
Gross and net margins for up to twelve crops, break-evens, water productivity, probability-weighted scenarios and farm totals.