Harvest Logistics Planner
Combine, chaser-cart, truck and intake balance; timeliness losses; harvest cost per tonne and least-cost fleet size.
Excel decision tool · Machinery & harvest
ASABE ownership and operating costs, cost per hectare and per tonne, own-vs-contract, 10-year replacement capex and buy/finance/lease appraisal.

Costs every machine in the fleet using ASABE remaining-value and repair coefficients, builds cost per hectare and per tonne for each field operation, tests owning against contractor rates, schedules replacement capital over ten years, and compares cash purchase, loan finance and leasing for any machine on a net-present-cost basis. Gives a single, defensible basis for fleet budgets, replacement decisions and financing.
A farm machinery cost calculator in Excel using ASABE D497 ownership and repair coefficients.
| Sheet | Type | What it contains |
|---|---|---|
| Cover | Cover | Title page, purpose, status and conventions. |
| Contents | Navigation | Model map with links to every sheet. |
| Dashboard | Output | Fleet economics, contracting, replacement and financing summary. |
| Inputs | Input | Scenario-driven assumptions register. Edit yellow cells only. |
| Fleet | Input | One row per machine. Class drives the ASABE coefficients. Age now drives the replacement schedule. |
| ASABE Coefficients | Reference | ASABE D497 remaining-value (C1–C3) and repair (RF1, RF2) coefficients by machine class. |
| Machine Costs | Calculation | Annual fixed (ownership) and per-hour operating costs for each machine (ASABE method). |
| Operations | Input | Each field operation: power unit, implement, work rate and passes. Costs per hectare and per tonne. |
| Own vs Contract | Calculation | Own cost vs contractor rate per operation, break-even area and recommendation. |
| Replacement Plan | Calculation | Ten-year replacement capital schedule at inflated prices, with trade-in at ASABE remaining value. |
| Finance Appraisal | Calculation | Cash purchase vs loan vs lease for the selected machine over the loan/lease term: net present cost of acquisition (operating costs identical and excluded). |
| Sensitivity | Output | Fleet cost per hectare for diesel price (across) × interest rate (down); cost is linear in both, so the grid is exact. |
| Risk Register | Control | Key investment and operating risks, scored Likelihood × Impact (1–5). Edit the scores and mitigations for your project. |
| Checks | Control | Integrity, reasonableness and data-quality tests. A failed Error must be fixed before results are relied on. |
| Methodology | Reference | Calculation methods, formulae, sources and limitations. |
| Version Log | Reference | Change control. Record every material change to logic or assumptions. |
Metric units throughout (hectares, m³, mm). Replace the illustrative figures with your own verified data before relying on any result.
Combine, chaser-cart, truck and intake balance; timeliness losses; harvest cost per tonne and least-cost fleet size.
Gross and net margins for up to twelve crops, break-evens, water productivity, probability-weighted scenarios and farm totals.