Machinery Cost & Fleet Investment
ASABE ownership and operating costs, cost per hectare and per tonne, own-vs-contract, 10-year replacement capex and buy/finance/lease appraisal.
Excel decision tool · Machinery & harvest
Combine, chaser-cart, truck and intake balance; timeliness losses; harvest cost per tonne and least-cost fleet size.

Balances combine capacity against chaser carts, trucks and store intake to find the bottleneck, converts finishing time into timeliness losses using workable-day weather risk, and costs the whole harvest system (ownership and operating). A fleet optimiser tests one to six combines with matched haulage to find the least-cost fleet including grain lost to delay, giving a defensible basis for machinery investment and contracting decisions.
A harvest logistics and combine fleet planner in Excel.
| Sheet | Type | What it contains |
|---|---|---|
| Cover | Cover | Title page, purpose, status and conventions. |
| Contents | Navigation | Model map with links to every sheet. |
| Dashboard | Output | Harvest-system summary for the active scenario. |
| Inputs | Input | Scenario-driven assumptions register. Edit yellow cells only. |
| Capacity | Calculation | Combine, cart and truck capacities, truck cycle and the system balance. |
| Timeliness | Calculation | Finishing time in calendar days (allowing for unworkable weather) and grain lost to delay. |
| Fleet Optimiser | Calculation | Least-cost number of combines with carts and trucks matched to each, including grain lost to delay. |
| Sensitivity | Output | Value of grain lost for workable-day fraction (across) × daily loss rate (down), current fleet. |
| Risk Register | Control | Key investment and operating risks, scored Likelihood × Impact (1–5). Edit the scores and mitigations for your project. |
| Checks | Control | Integrity, reasonableness and data-quality tests. A failed Error must be fixed before results are relied on. |
| Methodology | Reference | Calculation methods, formulae, sources and limitations. |
| Version Log | Reference | Change control. Record every material change to logic or assumptions. |
Metric units throughout (hectares, m³, mm). Replace the illustrative figures with your own verified data before relying on any result.
ASABE ownership and operating costs, cost per hectare and per tonne, own-vs-contract, 10-year replacement capex and buy/finance/lease appraisal.
Drying cost, cost of carry, sell-or-store timing with price risk, and on-farm storage investment appraisal.